Harbor Village at Pillar Point, Half Moon Bay, California

From Archiplanet

Jump to: navigation, search
Harbor Village at Pillar Point
Location Half Moon Bay, California, USA
Date
Building Type Retail Mall
Street Address Capistrano Rd.
Notes engineering by Hohbach-Lewin, Inc., Palo Alto, California, USA

Contents


[edit] Images

[edit] Discussion

Building Details
Cost About $28 Million
Area 180,000



This Mixed-Use complex currently under construction includes a 50,000 sq ft Retail Mall over a 40,000 sq ft Parking Garage, and a 90,000 sq ft 3-story Hotel Building, plus two separate small retail buildings. The Retail Center includes a large atrium skylight framed in structural steel tube sections. The majority of the building is supported on a post-tensioned slab lid covering a sub-grade parking garage. The Hotel is designed entirely in light gauge steel. The construction cost is approximately $28M.


[edit] Maps

[edit] References

[edit] External Links

Personal tools