Linked Hybrid, Beijing, China

From Archiplanet

Jump to: navigation, search
Linked Hybrid
Designer Steven Holl Architects, Beijing, China
Location Beijing, China
Date 2003 to 2009
Building Type Multi-Family Housing
Climate Warm Temperate
Context Urban
Architectural Style Deconstructivist Modern
Street Address
Notes

Contents


[edit] Images

[edit] Discussion

Building Details
Area 220,000 square meters ( 2.4 million square feet)
Height 66 meters (216.5 feet)
Site 6.18 hectares (15.27 acres)



[edit] Project Team

  • Architect: Steven Holl Architects, Beijing, China
    • Partner-in-Charge: Li Hu
    • Project Architects: Hideki Hirahara, Gong Dong, Edward Lalonde
    • Technical Advisor: Chris Mcvoy, Tim Bade
    • Project Team: Garrick Ambrose, Yenling Chen, Rodolfo Dias, James Macgillivray, Christian Beerli, Shih-I Chow, Cosimo Caggiula, Frank Cottier Christiane Deptolla, Guido Guscianna , Young Jang, Jongseo Lee, Richard Liu, Giorgos Mitroulas, Olaf Schmidt, Judith Tse, Clark Manning, Matthew Uselman, Ariane Weigner, Noah Yaffe, Liang Zhao,
  • Local Design Institute: Beijing Capital Engineering Architecture Design Co. LTD.
  • Structural Engineer: Guy Nordenson and Associates
  • Consulting Structural Engineers: China Academy of Building Research
  • Mechanical Engineer: TRANSSOLAR Energietechnik GmbH Cosentini Associates
  • Landscape Architects: EDAW Beijing
  • Curtainwall Consultant: XAC Architectural Decoration Co. LTD
  • Lighting Design: L'Observatoire International, New York, New York, USA


[edit] Maps

[edit] References

[edit] External Links


Personal tools