Lyon Opera, Lyon, France

From Archiplanet

Jump to: navigation, search
Lyon Opera
Designer Jean Nouvel
Location Lyon, France
Date 1986 to 1993
Building Type Theater
Construction System steel, glass
Context Urban
Architectural Style Modern
Street Address
Notes

Contents


[edit] Images

[edit] Discussion

Building Details
Client City of Lyon
Cost 72,870,000 Euro (67,000,000 USD) - 1993 values
Area 18,000 square meters (194,000 square feet)
Stories 7
Program 1300-seat opera, 200-seat amphitheatre, new rehearsal facilities, fly loft, restaurant, administration, workshops, hall


[edit] In the words of the Creator

"The competition to extend and renovate the Opera House in Lyon, the second largest city in France, was won by Nouvel in 1986 with a project that used the old building, particularly its grand ground- and first-floor façades on the south, east, and west, as a point of departure and reference for the new. The brief called for providing a larger auditorium, a second 200-seat amphitheater (which Nouvel placed in the three new basement levels) and public spaces, including a restaurant, new rehearsal facilities, and a fly tower. By retaining the older façades, Nouvel linked the building to the surrounding official buildings, such as the adjacent nineteenth century Hotel de Ville, the town hall and mayor's office for the city, and the nearby city museum, housed in the nineteenth-century Palais de Saint Pierre." - Ateliers Jean Nouvel

[edit] Project Credits

Architectural team

  • Jean Nouvel et Associés, Blamont (competition and conceptual phases) Jean Nouvel, Emmanuel Cattani et Associés (construction phase)
  • Project manager: Eric Maria, Françoise Raynaud
  • Architects: Marie-France Baldran, Viviane Morteau, Lea Thirode, Sabine Rosant, Material : Andrea Maeder
  • Site Coordination: Stefane Robert
  • Economist: Sery Bertrand

Consultant team

  • Scenography: Babel (design phase), Ducks (construction Phase)
  • Consultant Scenographer: Jacques Le Marquet
  • Structure: Kephren S.A.
  • Acoustics: Peutz Et Associes
  • Security: Casso Gaudin
  • HVAC: H.G.M
  • Cost Consultant: Scic
  • Technical Control: Socotec, Apave
  • Vault Lighting Consultant: Yann Kersale
  • Graphic Designer: Sabine Rosant
  • Photographs: Philippe Ruault, Stephane Couturier


[edit] Related Content from Wikipedia

Opéra Nouvel


See a related page at Wikipedia for additional information.


[edit] Maps

[edit] References

[edit] External Links

Personal tools