Qualcomm Inc. Building W Campus, Sorrento Mesa, California, USA
From Archiplanet
| Qualcomm Inc. Building W Campus | |
| Designer | Architects Delawie Wilkes Rodrigues Barker, San Diego, California, USA |
| Location | Sorrento Mesa, California, USA |
| Date | |
| Building Type | Office, Industrial, Parking, Power Plant |
| Climate | Mild Temperate |
| Context | Campus Context |
| Architectural Style | High Tech |
| Builder | Roel Construction |
| Green Certification | LEED Gold Certified |
| Street Address | 5745 Pacific Center Blvd Walk Score |
| Notes | 12-story, 411,950-square-foot engineering office facility; two-story chip testing facility, 4.6-megawatt co-generation plant and 372,465-square-foot, seven-story 1,343 space parking garage. Surpasses California Title 24 standards by 15.3 percent. |
Contents |
[edit] Images
[edit] Discussion
| Building Details | |
| Awards | LEED Gold |
Engineering consultants were Burkett & Wong for structural, ILA + Zammit Engineering Group for electrical, and Walsh Engineers for mechanical. Wimmer Yamanda and Caughey, San Diego, California, USA was the landscape architect. The campus encompasses a 12-story, 411,950-square-foot engineering office facility; a two-story chip testing facility, a 4.6-megawatt co-generation plant for power, and a 372,465-square-foot, seven-story parking garage. The garage, which is one level below-grade and six levels above-grade, accommodates 1,343 parking spaces.
[edit] Maps
[edit] References
[edit] External Links
http://www.sddt.com/Construction/article.cfm?SourceCode=20080228tdc

